home *** CD-ROM | disk | FTP | other *** search
- SECTION 10160
-
- METAL TOILET COMPARTMENTS
- NOTE ** This section includes powder-coat enamelled steel
- and stainless steel toilet compartments
- manufactured by Global Steel Products, Inc.,
- headquartered at the following address:
- NOTE ** Global Steel Products, Inc.
- NOTE ** 95 Marcus Blvd., Deer Park NY 11729-4595
- NOTE ** Telephone 516-586-3330
- NOTE ** FAX 516-586-3455
- NOTE **
- NOTE ** SECTION 10160 - METAL TOILET COMPARTMENTS,
- Copyright 1996, The Architect's Catalog, Inc.
-
- PART 1 GENERAL
-
- 1.1 SECTION INCLUDES
- NOTE ** Select one of the following two paragraphs. If
- more than one type of toilet compartment is
- required, indicate which type is used where, either
- on drawings or in the Schedules Article of this
- section.
-
- A. Powder-coat enamelled steel toilet compartments,
- consisting of:
-
- B. Stainless steel toilet compartments, consisting of:
- NOTE ** Delete items below not required for project.
-
- 1. Floor-mounted overhead-braced toilet compartments.
- 2. Floor-mounted toilet compartments.
- 3. Ceiling-hung toilet compartments.
- 4. Wall-mounted urinal screens.
- 5. Floor-mounted overhead-braced shower compartments.
- 6. Floor-mounted overhead-braced dressing compartments.
- 7. Floor-mounted dressing compartments.
-
- C. Compartment installation hardware.
-
- D. Compartment door hardware.
-
- 1.2 RELATED SECTIONS
- NOTE ** Delete any sections below not relevant to this
- project; add others as required.
-
- A. Section 10800 - Toilet, Bath, and Laundry Accessories.
- NOTE ** For ceiling hung compartments, structural
- suspension and bracing must be specified in another
- section. Structural steel, steel channels and
- angles, or "Unistrut" are used. Wood structure is
- not strong enough. Identify the section where this
- structure is specified: Section 05120 - Structural
- Steel, or 05500 - Metal Fabrications. Delete
- following paragraph if no ceiling hung compartments
- are used.
-
- B. Section _____ - Structural support for ceiling hung
- compartments.
-
- 1.3 SUBMITTALS
-
- A. Submit under provisions of Section 01300.
-
- B. Product Data: Manufacturer's printed literature
- indicating typical panel, pilaster, door, hardware and
- fastening.
-
- C. Shop Drawings: Submit six sets of the following:
- 1. Dimensioned plans indicating layout of toilet
- compartments.
- 2. Dimensioned elevations indicating heights of doors,
- pilasters, separation partitions, and other
- components; indicate locations and sizes of openings
- in compartment separation partitions for toilet and
- bath accessories to be installed in partitions;
- indicate floor and ceiling clearances.
- 3. Details indicating anchoring components and methods
- for project conditions; indicate components required
- for installation, but not supplied by toilet
- compartment manufacturer.
-
- D. Samples: Two manufacturer's color cards representing
- manufacturer's full color palette.
-
- 1.4 DELIVERY, STORAGE AND HANDLING
-
- A. Store compartment components until installation in
- unopened cartons in vertical position, with adequate
- support to ensure flatness and to prevent damage to
- prefinished surfaces.
-
- 1.5 ENVIRONMENTAL REQUIREMENTS
-
- A. Do not deliver materials or begin construction activities
- of this section until building is enclosed, with complete
- protection from outside weather, and building temperature
- maintained at a minimum of 60 degrees Fahrenheit.
-
- 1.6 SEQUENCING
-
- A. Obtain accessory manufacturer's installation instructions
- and installation templates for toilet and bath
- accessories to be installed in compartment separation
- partitions; supply instructions and templates to
- installer before beginning construction activities of
- this section.
-
-
- PART 2 PRODUCTS
-
- 2.1 MANUFACTURERS
-
- A. Acceptable Manufacturer: Global Steel Products, Inc.; 95
- Marcus Blvd., Deer Park NY 11729-4595; telephone 516-586-
- 3330, FAX 516-586-3455.
- NOTE ** Delete one of the two paragraphs below; coordinate
- with Division 1 requirements.
-
- B. Substitutions: Not permitted.
-
- C. Requests for substitutions will be considered in
- accordance with provisions of Section 01600.
-
- 2.2 POWDER-COAT ENAMELLED STEEL TOILET COMPARTMENTS
- NOTE ** Delete all but one of following three paragraphs;
- Embassy is floor-mounted overhead-braced, Regal is
- floor-mounted, Imperial is ceiling-hung.
-
- A. Acceptable Product: Embassy Steel Toilet Compartments.
-
- B. Acceptable Product: Regal Steel Toilet Compartments.
-
- C. Acceptable Product: Imperial Steel Toilet Compartments.
-
- D. Panels:
- 1. Nominal thickness: 1 inch.
- 2. Core: Kraft honeycomb, impregnated with water-
- resistant resins.
- 3. Face sheets: 0.032 +/- 0.002 inch galvanized steel
- sheet, stretcher-leveled; bonded under pressure to
- core with non-toxic adhesive.
- 4. Welded edge moldings on all edges forming rigid frame
- around component.
-
- E. Pilasters:
- 1. Nominal thickness: 1-1/4 inches.
- 2. Core: Kraft honeycomb, impregnated with water-
- resistant resins.
- NOTE ** Delete two of three paragraphs below. First
- paragraph is for overhead-braced compartments;
- second paragraph is for floor-mounted compartments;
- third paragraph is for ceiling-hung compartments.
- 3. Face sheets: 0.032 +/- 0.002 inch galvanized steel
- sheet, stretcher-leveled; bonded under pressure to
- core with non-toxic adhesive; sides sealed with edge
- molding.
- 4. Face sheets: 0.046 +/- 0.002 inch galvanized steel
- sheet, stretcher-leveled; bonded under pressure to
- core with non-toxic adhesive; sides and top sealed
- with edge molding.
- 5. Face sheets: 0.046 +/- 0.002 inch galvanized steel
- sheet, stretcher-leveled; bonded under pressure to
- core with non-toxic adhesive; sides and bottom sealed
- with edge molding.
- NOTE ** Delete two of three paragraphs below. First
- paragraph is for overhead-braced compartments;
- second paragraph is for floor-mounted compartments;
- third paragraph is for ceiling-mounted
- compartments.
- 6. Reinforcement for installation: Inverted stirrup
- bracket, with adjusting jack bolt, welded within
- pilaster base.
- 7. Reinforcement for installation: Inverted stirrup
- bracket, 0.116 +/- 0.002 inch steel, slotted for
- field adjustment, welded within pilaster base.
- 8. Reinforcement for installation: Stirrup bracket,
- 0.116 +/- 0.002 inch steel, slotted for field
- adjustment, welded within pilaster top.
-
- F. Doors:
- 1. Nominal thickness: 1 inch.
- 2. Core: Kraft honeycomb, impregnated with water-
- resistant resins.
- 3. Face sheets: 0.032 +/- 0.002 inch galvanized steel
- sheet, stretcher-leveled; bonded under pressure to
- core with non-toxic adhesive.
- 4. Welded edge moldings on all edges forming rigid frame
- around component.
-
- G. Edge Moldings: 0.032 +/- 0.002 inch interlocking
- molding, with molding corners welded to each other and to
- face sheets and ground smooth.
- NOTE ** 16 standard colors are available.
-
- H. Finish: Polyester powder-coat finish, 1.7 mil minimum
- thickness, on chemically cleaned, degreased, phosphatized
- surface; color selected from manufacturer's standard
- color palette.
-
- 2.3 STAINLESS STEEL TOILET COMPARTMENTS
- NOTE ** Delete all but one of following three paragraphs;
- Embassy is floor-mounted overhead-braced, Regal is
- floor-mounted, Imperial is ceiling-hung.
-
-
- A. Acceptable Product: Embassy Stainless Steel Toilet
- Compartments.
-
- B. Acceptable Product: Regal Stainless Steel Toilet
- Compartments.
-
- C. Acceptable Product: Imperial Stainless Steel Toilet
- Compartments.
-
- D. Panels:
- 1. Nominal thickness: 1 inch.
- 2. Core: Kraft honeycomb, impregnated with water-
- resistant resins.
- 3. Face sheets: 0.032 +/- 0.002 inch stainless steel
- sheet, No. 4 satin finish, stretcher-leveled; bonded
- under pressure to core with non-toxic adhesive.
- 4. Welded edge moldings on all edges forming rigid frame
- around component.
- a. Edges: 0.032 +/- 0.002 inch stainless steel
- interlocking molding, with molding corners welded
- to each other and to face sheets; welds ground
- smooth and polished to match faces.
-
- E. Pilasters:
- 1. Nominal thickness: 1-1/4 inches.
- 2. Core: Kraft honeycomb, impregnated with water-
- resistant resins.
- NOTE ** Delete two of three paragraphs below. First
- paragraph is for overhead-braced compartment;
- second paragraph is for floor-mounted compartments;
- third paragraph is for ceiling-mounted
- compartments.
- 3. Face sheets: 0.032 +/- 0.002 inch stainless steel
- sheet, No. 4 satin finish, stretcher-leveled; bonded
- under pressure to core with non-toxic adhesive; sides
- sealed with edge molding.
- 4. Face sheets: 0.046 +/- 0.002 inch stainless steel
- sheet, No. 4 satin finish, stretcher-leveled; bonded
- under pressure to core with non-toxic adhesive; sides
- and top sealed with edge molding.
- 5. Face sheets: 0.046 +/- 0.002 inch stainless steel
- sheet, No. 4 satin finish, stretcher-leveled; bonded
- under pressure to core with non-toxic adhesive; sides
- and bottom sealed with edge molding.
- NOTE ** Delete two of three paragraphs below. First
- paragraph is for overhead-braced compartments;
- second paragraph is for floor-mounted compartments;
- third paragraph is for ceiling-mounted
- compartments.
- 6. Reinforcement for installation: Inverted stirrup
- bracket, with adjusting jack bolt, welded within
- pilaster base.
- 7. Reinforcement for installation: Inverted stirrup
- bracket, 0.116 +/- 0.002 inch steel, slotted for
- field adjustment, welded within pilaster base.
- 8. Reinforcement for installation: Stirrup bracket,
- 0.116 +/- 0.002 inch steel, slotted for field
- adjustment, welded within pilaster top.
-
- F. Doors:
- 1. Nominal thickness: 1 inch.
- 2. Core: Kraft honeycomb, impregnated with water-
- resistant resins.
- 3. Face sheets: 0.032 +/- 0.002 inch stainless steel
- sheet, No. 4 satin finish, stretcher-leveled; bonded
- under pressure to core with non-toxic adhesive.
- 4. Welded edge moldings on all edges forming rigid frame
- around component.
-
- G. Edge Moldings: 0.32 +/- 0.002 inch stainless steel
- interlocking molding , with molding corners welded to
- each other and to face sheets; welds ground smooth and
- polished to match faces.
-
- 2.4 ACCESSORIES
-
- A. Pilaster Shoes: One-piece Type 304 stainless steel
- assembly, No. 4 satin finish, having an internal cross
- section conforming to the pilaster; held in place with
- concealed fastening clips.
- NOTE ** Delete all but one of the three paragraphs below.
- The first paragraph is for overhead-braced floor-
- mounted compartments; the second paragraph is for
- floor-mounted compartments; the third paragraph is
- for ceiling-hung compartments.
- NOTE **
- NOTE ** Floor-mounting requires a concrete floor for
- adequate anchorage. Ceiling-mounting requires
- steel structure for support.
-
- B. Pilaster Anchors: Inverted stirrup with jack bolt for
- leveling during installation and permanent height
- adjustment, integrally welded to base of pilaster, with
- "L" brackets coupled to stirrup bracket and floor for
- full range adjustment; concealed by pilaster shoe after
- installation.
-
- C. Pilaster Anchors: 0.116 +/- 0.002 inch slotted stirrup
- bracket integrally welded in base of pilaster, with two
- 3/8-inch diameter cadmium-plated studs anchoring bracket
- to floor; concealed by pilaster shoe after installation.
-
- D. Pilaster Anchors: 0.116 +/- 0.002 inch slotted stirrup
- bracket integrally welded to top of pilaster, with two
- 3/8-inch diameter cadmium-plated studs anchoring bracket
- to structure overhead; concealed by pilaster shoe after
- installation.
- NOTE ** Delete paragraph below if urinal screens not
- required.
-
- E. Urinal Screen Brackets: Full height 38-inch-long two ear
- anodized aluminum with satin finish.
- NOTE ** Delete paragraph below if overhead-braced
- compartments are not required.
-
- F. Head Rail: Manufacturer's standard anodized aluminum
- rail with anti-grip device.
- NOTE ** Delete one of the following two sets of paragraphs
- on brackets and hardware.
-
- G. Brackets: Heavy duty, die-cast non-ferrous chrome-
- plated, with chrome-plated throughbolts and fasteners
- with tamper-resistant heads.
-
- H. Door Hardware: Heavy duty, die-cast non-ferrous chrome-
- plated.
- NOTE ** Stainless steel brackets and hardware are an extra
- cost option.
-
- I. Brackets: Die-cast No.304 stainless steel, No.4 satin
- finish, with throughbolts and fasteners of same material
- and finish with tamper-resistant heads.
-
- J. Door Hardware: Die-cast No.304 stainless steel, with
- No.4 satin finish.
- NOTE ** The following sub-paragraphs apply to both types of
- hardware.
- 1. Top Hinge: Recessed and interlocked in door, with
- nylon pin in the plane of the door, through-bolted.
- 2. Bottom Hinge: Recessed in door, with mating box and
- pintle nylon cams providing the bearing surface;
- adjustable to allow door to rest at any position
- within a 270-degree range; through-bolted.
- 3. Latch: Concealed, with emergency access.
- 4. Stop and Keeper: Through bolted.
- 5. Coat Hook and Bumper: Surface-mounted.
- 6. Fastening Hardware: Tamper-resistant heads.
-
- K. Toilet, Bath, and Laundry Accessories for Installation in
- Compartment Separation Partitions: Specified in Section
- 10800.
-
-
- PART 3 EXECUTION
-
- 3.1 EXAMINATION
-
- A. Verification of Conditions:
- 1. Measure areas to receive compartments; verify area
- dimensions are in accordance with shop drawings.
- 2. Verify built-in framing, anchorage, bracing, and
- plumbing fixtures are in correct location.
-
- B. Installer's Examination:
- 1. Have installer of this section examine conditions
- under which construction activities of this section
- are to be performed, then submit written notification
- if such conditions are unacceptable.
- 2. Transmit two copies of installer's report to
- Architect within 24 hr of receipt.
- 3. Beginning construction activities of this section
- before unacceptable conditions have been corrected is
- prohibited.
- 4. Beginning construction activities of this section
- indicates installer's acceptance of conditions.
-
- 3.2 PREPARATION
-
- A. Surface Preparation:
- 1. Prepare openings in compartment separation partitions
- for toilet and bath accessories to be installed in
- partitions; marring of partition finish is
- prohibited.
- 2. Locate openings in accordance with shop drawings and
- accessory manufacturer's installation instructions
- and templates.
-
- 3.3 INSTALLATION
-
- A. Install compartments to specified tolerances in
- accordance with shop drawings and manufacturer's printed
- installation instructions.
-
- B. Attach components to adjacent materials and to other
- components using purpose-designed fastening devices.
- NOTE ** Delete one of two paragraphs below.
-
- C. Adjust pilaster anchors for floor variations; conceal
- anchors with pilaster shoes.
-
- D. Support pilasters from above ceiling framing using two
- adjustable hanging studs for vertical adjustment to
- level; conceal ceiling fastenings with pilaster shoes.
- NOTE ** All of the remaining provisions apply to all of the
- types of compartments in this section.
-
- E. Equip each compartment door with top and bottom hinges,
- and door latch.
-
- F. Install door strike keeper on pilasters in alignment with
- door latch.
-
- G. Equip each compartment door with one coat hook and
- bumper.
-
- H. Installation Tolerances:
- 1. Maximum variation from plumb or level: 1/8 inch.
- 2. Maximum displacement from indicated position: 1/8
- inch.
- 3. Clearance between wall surface and panels or
- pilasters: 1-1/2 inch, maximum.
-
- 3.4 ADJUSTING
-
- A. Adjust door hardware for uniform clearance between doors
- and pilasters.
-
- B. Adjust door hinges to attain free movement, to locate
- in-swinging doors in partial open position when
- unlatched; and to return out-swinging doors to closed
- position.
-
- C. Adjust door hardware to align door strike keeper on each
- pilaster with door latch.
-
- 3.5 PROTECTION OF INSTALLED PRODUCTS
-
- A. Prevent damage to product finishes by subsequent
- construction activities.
-
- B. Repair damaged finishes; replace components having
- damaged finish if repair is not possible.
-
- C. Remove factory protective coverings and clean finish
- surfaces in accordance with manufacturer's instructions
- before final inspection.
-
- 3.6 SCHEDULE
- NOTE ** If more than one type of partition, or more than
- one color or finish, is required, a schedule may
- help identify where each is to be used.
-
- A. Men's Toilet Room No. ___: Enamelled steel ceiling-hung
- toilet compartments and wall-mounted urinal screens;
- _______ color.
-
- B. Women's Shower Room No. ___: Stainless steel floor-
- mounted shower compartments.
-
- END OF SECTION
-